75-second demonstration storyboard — spreadsheet row-edit acceptance test This is a production plan, not a claim of recorded agent edits. 00–10: Show original fixture. Explain the goal: change three status cells while preserving every other cell. 10–20: Highlight IDs003/007/011; keep neighboring rows002/004,006/008,010/012 visible. Explain that IDs are text, not sheet row numbers. 20–35: Show the exact prompt and prerequisites. Model endpoint and operator permissions must be ready before the run. 35–45: Show the actual31Oct preflight: the app retains a loopback fixture URL; its port refuses connections. State that the model run did not start. 45–60: Show the expected reference as a reference, then the observed unchanged worksheet. Display diff:0actual changes,3missing expected changes,0unexpected changes. 60–75: Show recovery: configure a real compatible endpoint, reset working copy, rerun exact prompt, export and verify every cell. Keep the original unchanged. No live-model success footage until a completed run exists.